Reider Racing HomeCustomer Rides!Site DirectoryFREE CATALOG!!!

New Gear Break-In Procedure
All new ring & pinion sets require a brief break-in period in order to ensure long life and quiet operation. The following break-in procedure is recommended before applying a heavy load and/or constant usage.
1. Insure that the axle has been filled to the correct level with 
    proper hypoid lubricant before driving the vehicle. 
    The oil rating must be GL5 or higher.   

2.Bring the axle to normal operating temperature by driving the 
    vehicle (unloaded) for approximately 15 to 20 miles. Do not
    run full throttle accelerations or create any shock loads. 

3. Let the axle assembly cool completely. 

4. For the next 200 miles of operation, drive gently, without any heavy loads.

5.If trailer towing is intended, an additional cycle of 200 to 300 miles 
    of break-in is required without the trailer. This is important! To properly 
    break-in a new gear set, a minimum of 500 miles of driving is essential 
    before towing.

If This Procedure Is Not Followed, Overheating And Eventual Gear 
And/Or Bearing Failure May Result.
C-CilpsCross ShaftsLocking HubsAdjustable ShimsSoild Spacer KitsRing Gear SpacersSpider Gear KitsGridles
Ring and PinionsDifferentialsInstallation and Set-Up KitsThird MembersHigh Performance AxlesSpools and Mini Spools
About Reider Racing
   ·Corporate History
   ·Meet Team Reider
   ·Careers @ Reider
   ·Corporate Racing
   ·Media Relations
   ·Contact
About Our Company
Corporate History 
Careers At Reider 
Media Relations
Awards & Sponsorships
Contact
About Our Company
Corporate History 
Careers At Reider 
Media Relations
Awards & Sponsorships
Contact
Reider Tech l New Products l Xtreme Deals l Free Catalog l Contact
Copyright, Reider Racing Ent., Inc. 2003

.

Other Options
Back to Reider Tech